Spain’s Nuclear Fleet Generated Over 52 TWh Of Electricity In 2024

Output from reactors shows need for guarantee of supply

Spain’s Nuclear Fleet Generated Over 52 TWh Of Electricity In 2024
The Almaraz nuclear power station in Spain. The country has a fleet of seven commercial nuclear plants. Courtesy Foro Nuclear.

Spain’s fleet of seven commercial nuclear power plants generated just over 52 TWh net of electricity in 2024, accounting for 19.57% of the country’s total net electricity production, Madrid-based nuclear industry group Foro Nuclear said.

The figure was down from 57.2 TWh in 2023. However, with a net installed capacity of 7,117 MW – significantly less than another other energy source and accounting for only 5.44% of the total – nuclear energy ranked as the second-largest source of electricity production in Spain, according to provisional data from Red Eléctrica analysed by Foro Nuclear.

Wind was first in terms of generation, accounting for 22.89% of production, but with a 24% share of installed capacity.

Want to keep reading?

Register free and get full access to NucNet for 14 days. No card required.

Republish or license this article

MORE THAN 30 YEARS OF NUCLEAR INDUSTRY REPORTING.

Subscribe for full access to every article, the archive and the SMR and AMR database.

Join NucNet