Fuel Loading Begins At Bangladesh’s First Nuclear Power Plant

Two VVER-1200 units being provided under contract with Russia’s Rosatom

Fuel Loading Begins At Bangladesh’s First Nuclear Power Plant
The Rooppur nuclear power station is about 150 km west of the capital Dhaka. Courtesy Rosatom.

Fuel loading has begun at the first commercial nuclear power plant to be built in Bangladesh, Russia's state nuclear corporation Rosatom has said.

According to reports in Bangladesh, fuel loading at Rooppur-1 is expected to be completed in less than 45 days.

Rosatom said fuel loading is the first phase of the key commissioning stage of the unit. 

Later, the reactor will be brought to minimum controlled level, after which a gradual increase of power will begin. The next stage will be power startup when the generated electricity will be transmitted to the power grid of Bangladesh, Rosatom said.

Want to keep reading?

Register free and get full access to NucNet for 14 days. No card required.

Republish or license this article

MORE THAN 30 YEARS OF NUCLEAR INDUSTRY REPORTING.

Subscribe for full access to every article, the archive and the SMR and AMR database.

Join NucNet