Bulgaria / Sofia Wants To Study Technical Feasibility Of Using Russian Equipment For Belene New Build

Moscow delivered large components after arbitration row

Sofia Wants To Study Technical Feasibility Of Using Russian Equipment For Belene New Build
Aerial view of the Belene area on the Danube River in northern Bulgaria, a site designed for a second nuclear station in the late 1980s.

Bulgaria is negotiating with France’s nuclear equipment manufacturer Framatome to carry out a study on the technical feasibility of using Russia-made equipment to build the proposed Belene nuclear power station, but possibly without depending on Russian companies, according to Sofia’s energy minister Rosen Hristov.

Hristov said earlier this month during a visit to the Belene site that the ministry wants to see a full analysis of what can be built with the existing nuclear island equipment and “whether there will be any dependence on Russian companies in the future, addressing all risks, including geopolitical ones”.

Want to keep reading?

Register free and get full access to NucNet for 14 days. No card required.

Republish or license this article

MORE THAN 30 YEARS OF NUCLEAR INDUSTRY REPORTING.

Subscribe for full access to every article, the archive and the SMR and AMR database.

Join NucNet