Poland / Private Project To Build South Korean Reactors At Patnow Coal Site Gathers Pace

ZE PAK And PGE sign agreement to establish joint project company for APR-1400 units
Private Project To Build South Korean Reactors At Patnow Coal Site Gathers Pace
The aim is to deploy APR-1400 reaxctors at the Patnow coal-fired generation site (pictured), owned by ZE PAK.
Polish private energy company ZE PAK and state-controlled Polska Grupa Energetyczna (PGE) have signed an agreement to establish a joint company to manage the proposed deployment of an APR-1400 power station in Poland.

A joint statement by the companies said that the new entity will carry out a feasibility study, site survey, and environmental impact assessment in preparation for construction of at least two South Korean APR-1400 pressurised water reactor units.

In October 2022, ZE PAK and PGE signed a letter of intent with Korea Hydro and Nuclear Power (KHNP) for eventual deployment of the company’s APR-1400 PWR technology at the Patnow coal-fired generation site, owned by ZE PAK.

The project is to be developed as a private initiative and would not be run by the government under its central 2020 nuclear energy programme, although PGE is majority-owned by the Polish state.

Want to keep reading?

Register free and get full access to NucNet for 14 days. No card required.

Republish or license this article

MORE THAN 30 YEARS OF NUCLEAR INDUSTRY REPORTING.

Subscribe for full access to every article, the archive and the SMR and AMR database.

Join NucNet