Belarus / Official Trial Operation Begins For Russia-Supplied Belarusian-2 Nuclear Plant

VVER-1200 unit scheduled to go commercial in October

Official Trial Operation Begins For Russia-Supplied Belarusian-2 Nuclear Plant
There are two Russia-supplied reactor units at the Ostrovets site in western Belarus, near the Lithuanian border.

The Belarusian-2 nuclear power plant began trial operation on 31 May, a stage which will see reactor output increased to its maximum level, the operator said in a statement.

The Belarusian nuclear power station said power levels will be increased from the current 50% of full capacity to 100% and will be coupled with a wide range of technical, equipment, and operating testing, including a brief disconnect from the national power grid.

The official Belta news agency quoted a ministry of energy official as saying that the Belarusian-2 reactor output level was in the process of being raised to 75%, with a total of more than 200 tests scheduled.

On 13 May 2023, Belarusian-2 was connected to the national grid and started generating electricity for the first time. The unit turbines were tuned on when the reactor system reached 40% of its full power output.

Earlier reports said twin Belarusian-2 is earmarked for commercial operation in October 2023.

There are two Russia-supplied Generation III VVER-1200 reactor units at the Ostrovets site in western Belarus, near the Lithuanian border.

Belarusian-1 became the country’s first nuclear power plant to begin commercial operation in June 2021 after being connected to the grid in November 2020.

Republish or license this article

MORE THAN 30 YEARS OF NUCLEAR INDUSTRY REPORTING.

Subscribe for full access to every article, the archive and the SMR and AMR database.

Join NucNet