Norway Consortium Gets €1.8 Million Towards Development Of Nuclear Power For Maritime Industry

Target of propulsion system project is for first deployment in 2031 or 2032

Norway Consortium Gets €1.8 Million Towards Development Of Nuclear Power For Maritime Industry
The project aims to move maritime reactor technology from engineering studies into full-scale testing. Courtesy Vard.

Norway is moving a step closer to testing nuclear propulsion for commercial ships, with a consortium including shipbuilder Vard and offshore service vessel operator Island Offshore securing NOK20m (€1.8m, $2m) in government funding to develop an integrated nuclear power system for the maritime industry.

The marine nuclear propulsion system (MarNuPS) project, led by Emerald Nuclear Norway, aims to move the technology from engineering studies into full-scale testing, with a first vessel deployment targeted for 2031 or 2032.

The initial funding comes from the Research Council of Norway and supports a broader development programme that will bring together reactor technology, ship design, electrical systems and vessel operations.

The first phase, scheduled for 2027, will establish a test facility at Stette, near Alesund, where the partners plan to assemble and test a full-scale representation of the proposed shipboard propulsion system.

The initial testing will not involve an operating nuclear reactor. Instead, the system will use electric heating to simulate the reactor’s thermal output, allowing engineers to evaluate how the propulsion and power systems work together before moving to nuclear operation.

Testing will examine normal vessel operations, rapid changes in power demand, system performance, stress conditions and crew interaction.

The project is based on Emerald Nuclear’s 5-MW Gem microreactor technology, using a gas-cooled reactor design coupled with a supercritical carbon dioxide turbine system to generate electricity. The integrated system will also include energy storage, remote monitoring, power management and shipboard automation.

According to Emerald Nuclear, the first phase has an estimated total cost of NOK150m, with project partners providing substantial funding beyond the government grant.

The consortium also includes the Norwegian University of Science and Technology, Imperial College London and engineering specialist Maskindynamikk.

Republish or license this article

MORE THAN 30 YEARS OF NUCLEAR INDUSTRY REPORTING.

Subscribe for full access to every article, the archive and the SMR and AMR database.

Join NucNet