Coal-To-Nuclear / Reuse Of Infrastructure Can Cut SMR Construction Costs By 35%, Report Says

77% of jobs transferable ‘with no new workforce licensing requirements’
Reuse Of Infrastructure Can Cut SMR Construction Costs By 35%, Report Says
A coal plant in the US state of Georgia. Courtesy Sam Nash/Wikipedia.
Nearly one-fourth of the current US coal-fired fleet is scheduled to retire by 2029, providing opportunities to use existing infrastructure for small modular reactors and reduce construction costs by 17% to 35%, a Washington DC think tank said in a report.

The reactors can reuse coal plant electrical equipment and steam-cycle components that, combined with reuse of transmission and administrative buildings, can reduce SMR construction costs by 17% to 35%, according to John Jacobs and Lesley Jantarasami, authors of Can Advanced Nuclear Repower Coal Country? released by the Bipartisan Policy Center.

The US Nuclear Regulatory Commission’s certification in January of NuScale Power’s SMR design, the country’s first such federal approval, “pushes the technology closer to maturity”, the report said.

SMRs can reuse coal plant transmission infrastructure, reducing SMR construction costs and avoiding some permitting challenges. And the reactors can reuse coal plant electrical equipment and steam-cycle components that, combined with reuse of transmission and administrative buildings, can reduce SMR construction costs by 17% to 35%, according to the report.

Want to keep reading?

Register free and get full access to NucNet for 14 days. No card required.

Republish or license this article

MORE THAN 30 YEARS OF NUCLEAR INDUSTRY REPORTING.

Subscribe for full access to every article, the archive and the SMR and AMR database.

Join NucNet