Kazakhstan / Joint Venture Delivers Second Batch Of Nuclear Fuel Assemblies To China

Kazatomprom ‘finding it more difficult’ to transport material to West

Joint Venture Delivers Second Batch Of Nuclear Fuel Assemblies To China

The joint Kazakh-Chinese Ulba-TVS nuclear fuel assembly plant has delivered a second batch of nuclear fuel assemblies, containing more than 30 tonnes of low-enriched uranium, to China, the press service of Kazatomprom national atomic company reported on 31 May.

The nuclear fuel was manufactured at the joint enterprise in Ust-Kamenogorsk in eastern Kazakhstan and was delivered to the Fangchenggang nuclear power station in southern China. There are three units in operation at Fangchenggang and one under construction.

The Ulba-TVS plant, a joint venture between Kazatomprom subsidiary UMP JSC, with 51%, and China’s CGNPC-URC, a subsidiary of China General Nuclear Power Group, with 49%, started operating in November 2021.

A first batch of nuclear fuel assemblies produced by Ulba-TVS was delivered to China in December 2022.

Want to keep reading?

Register free and get full access to NucNet for 14 days. No card required.

Republish or license this article

MORE THAN 30 YEARS OF NUCLEAR INDUSTRY REPORTING.

Subscribe for full access to every article, the archive and the SMR and AMR database.

Join NucNet