Corporate

China / Output From CGN’s 27 Nuclear Reactors Increases By Almost 8%

By Kamen Kraev
1 April 2024

Company has 43.8 GW of reactor capacity already installed or under construction

Output From CGN’s 27 Nuclear Reactors Increases By Almost 8%
The control room at the Fangchenggang-3 nuclear power plant, which began commercial operation last year.
The nuclear energy output of the China General Nuclear Power Group (CGN) reached 214.1 TWh in 2023, which meant an increase of almost 8% over the preceding year, according to the China Nuclear Energy Association (CNEA).

Want to know more?
Sign up.

Pen Use this content

Tags


Related