US / NRC Sets Stage for Advanced Nuclear With New ‘Part 53’ Licensing Rule

First regulatory framework for technologies and designs that include non-light-water reactors

NRC Sets Stage for Advanced Nuclear With New ‘Part 53’ Licensing Rule

The US Nuclear Regulatory Commission (NRC) has directed its staff to publish a proposed rule and draft guidance to create Part 53, a long-awaited licensing framework geared toward advanced technologies, including advanced reactors.

“This is the first regulatory framework developed for advanced technologies and designs that includes non-light-water reactors,” the NRC said.

In a staff requirements memorandum (SRM) made public on 4 March, the commission directed staff to incorporate several changes to a March 2023 draft proposal within six months of the SRM’s issuance. A final version of the proposed rule is expected by September 2024. A final rule should be issued within 12 to 18 months after the proposal’s publication, taking into account a public comment period.

Want to keep reading?

Register free and get full access to NucNet for 14 days. No card required.

Republish or license this article

MORE THAN 30 YEARS OF NUCLEAR INDUSTRY REPORTING.

Subscribe for full access to every article, the archive and the SMR and AMR database.

Join NucNet